We’ll Deliver Ijebu Ode-Epe Expressway By Christmas—Abiodun

Governor Abiodun

The Ogun State Governor, Prince Dapo Abiodun on Saturday assured the people of the State that the 14.7km Ijebu Ode-Epe Expressway would be ready for their use by Christmas.

Prince Dapo Abiodun, who made this known while on an on-the-spot assessment tour of the road, got assurance from the contractors that about eight to nine kilometres of one lane of the road would be completed in the next ten days.

“The entire stretch going all the way from Epe to Ijebu-Ode would be completed by Christmas,” the Governor said.

He added that the award of the interchange flyover which would be in form of a loop was awarded so as to ensure that accidents do not occur on the road as has been witnessed at other interchanges or intersections in the past.

ALSO READ  4 Brilliant Ways Nigerians Can Increase Visibility On Linkedin

“The contractors have assured me that they will intensify work on this road. I have insisted because we have Christmas approaching, and so, they must complete one segment of this road – one lane all the way to Ijebu-Ode.

“They, in turn assured me that in the next ten days, they would have completed about eight to nine kilometres of one lane, and promised to ensure that by Christmas, the entire stretch going all the way from Epe to Ijebu-Ode is completed.

“Furthermore, we’ve just awarded the interchange flyover contract that will allow for ease of traffic from this road into Ijebu-Ode and onto the expressway, so that we do not have a situation where people are speeding on this road and they run onto the Sagamu-Ore Expressway and then we begin to have accidents like we’ve seen in other interchanges or intersections.

ALSO READ  APC Government Is “Bad Change”—PDP

“It is going to be a loop. It  has been awarded. The contractor has started to mobilise and get ready to begin that loop,” he said.

Governor Abiodun further disclosed that the opening of the road would further open up the corridor for more industrial activity, while adding that the road when completed would also increase the efficiency of travel and longevity of road.

Prince Abiodun stressed that the road, when completed, would not only connect the State to Lagos State, but connect the mid-western states of the Country to the Eastern part.

He noted that the road would also help to reduce the burden of traffic on the Lagos-Ibadan Expressway.

“This road connects not just Ogun State to Lagos State. It connects the rest of the mid-western Nigeria to the Eastern part of the country, so by doing this road, we are increasing the efficiency of travel, and longevity of the road itself.

ALSO READ  Ogun Nursing Schools, Midwifery, Get Full Accreditation after 45years

“This stretch will now be open to more industrial activity as you will know that Lagos is expanding along the Lekki corridor: this is where you have the Free Trade Zone, Dangote Refinery. Industrial expansion is in this area, so we are opening up this road to increased economic activity,” he said.

Abiodun said his administration has awarded the construction of the Molipa Expressway, while noting that construction work would soon commence as the contractors have already been mobilised.

Share This Post

Leave a Reply

%d bloggers like this: